Paul Stewart a crit :
>
> Wee took delivery of our 914 about 2 1/2 years ago. We are still a  
> long way from flying or even commissioning the engine. I know the  
> engines come prepared for storage but is there a time limit before we  
> should be doing anything other than look longingly at it?
>
>   
Paul,

You may want to open the crate and read your Installation Manual, page 
22-23. They say someting has to be done after a 12 month storage period. 
But in my opinion, you better leave it alone and not open it before your 
are ready for installation, provided you stored it in a dry place.
We too took a long time before installing the engine.


Regards,
Gilles Thesee
Grenoble, France